Uganda Rail Network Profile

Uganda operates a limited rail network, primarily serving freight with some passenger services, focusing on rehabilitation and regional connectivity through Kenya to the Port of Mombasa.

Network Overview

Parameter Statistics Notes
Total Track Length 1,250 km Historical network
Operational Lines 260 km Limited service
Track Gauge 1,000 mm Meter gauge
New Standard Gauge Planned 1,435 mm
International Links 1 Kenya (limited)

Major Lines

Active Routes

Route Length (km) Status Usage Type
Kampala-Malaba 190 Limited Freight Main line
Kampala-Port Bell 9 Active Lake link Branch
Tororo-Gulu 500 Rehabilitation Mixed Northern line
Kampala-Kasese 333 Inactive – Western line

Technical Parameters

Track Infrastructure

Parameter Current Network Planned SGR
Track Gauge 1,000mm 1,435mm
Rail Profile 45/56 lb/yd 60 kg/m
Max Axle Load 16.5t 25t
Design Speed 40-60 km/h 120 km/h

Rolling Stock

Current Fleet

Type Quantity Status Usage
Locomotives 12 Limited Mixed
Freight Wagons 580 Mixed Various
Passenger Cars 15 Limited Occasional

Planned SGR Fleet

Type Quantity Status Timeline
Electric Locomotives 20* Planned With SGR
Freight Wagons 1,000* Planned With SGR
Passenger Sets 10* Planned With SGR

*Projected figures

Operations

Freight Services

Service Frequency Annual Volume (K tonnes) Type
Import/Export Weekly 180 Container/Bulk
Domestic Monthly 50 Various
Lake Services Regular 120 Port connection

Infrastructure Development

Current Projects (2025-2027)

Project Budget (USD M) Status Completion
Meter Gauge Revival 250 Active 2026
Tororo-Gulu Rehabilitation 180 Ongoing 2027
Port Bell Upgrade 45 Planning 2026

Future Plans (2027-2030)

Project Estimated Cost (USD B) Status Notes
SGR Development 2.5 Planning Malaba-Kampala
Western Extension 1.8 Concept To DRC
Northern Corridor 1.2 Proposed Regional link

Environmental Initiatives

Sustainability Goals

Initiative Target Timeline Status
Efficiency +25% 2028 Planning
Emissions -20% 2030 Concept
Reforestation Track corridors 2027 Initial

Economic Impact

Employment

Sector Direct Jobs Indirect Jobs
Operations 1,200 3,600
Maintenance 800 2,400
Development 2,000 6,000

Regional Integration

Planned Connections

Country Status Project Timeline
Kenya Planning SGR link 2027+
DRC Concept Western extension 2030+
South Sudan Proposed Northern link Long-term

Challenges & Solutions

Key Issues

Challenge Impact Solution Strategy
Infrastructure Age High Phased rehabilitation
Funding Critical International partnerships
Technical Capacity High Training programs
Competition High Service improvement

International Support

Development Partners

Partner Focus Area Support Type
World Bank Infrastructure Financial/Technical
China SGR Development Investment/Technical
AfDB Rehabilitation Loans/Grants
EU Technical Support Capacity Building
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock