Vietnam Rail Network Profile

Vietnam operates a north-south rail network managed by Vietnam Railways (VNR), featuring significant modernization plans including high-speed rail development and urban metro systems in major cities.

Network Overview

Parameter Statistics Notes
Total Track Length 3,143 km Active network
Main North-South Line 1,726 km Hanoi-HCMC
Track Gauge Mixed 1,000mm/1,435mm
Electrified Lines Limited Urban systems
International Links 2 China (2 routes)

Major Systems

Main Lines

Route Length (km) Gauge Status Type
Hanoi-HCMC 1,726 1,000mm Active Main line
Hanoi-Lao Cai 296 1,000mm Active International
Hanoi-Dong Dang 162 Dual Active International
Hanoi-Haiphong 102 1,000mm Active Port link

Urban Systems

City System Length (km) Status
Hanoi Metro Metro 13 Partial operation
HCMC Metro Metro 19.7 Under construction
Cat Linh-Ha Dong Metro 13.1 Operational

Technical Parameters

Track Infrastructure

Parameter Main Lines Urban Planned HSR
Track Gauge 1,000mm 1,435mm 1,435mm
Power Supply Diesel 750V DC 25kV AC
Max Speed 80-120 km/h 80 km/h 320 km/h*
Signaling Various CBTC ETCS L2*

*Planned specifications

Rolling Stock

Main Line Fleet

Type Quantity Manufacturer Usage Status
D19E Locomotives 40 Various Main line Active
Passenger Cars 1,000+ Various Mixed Mixed
Freight Wagons 4,500+ Various Freight Mixed

Urban Fleet

Type Quantity Manufacturer System Status
Hanoi Metro 13 sets CRRC Line 2A Active
HCMC Metro 17 sets Hitachi Line 1 Delivery

Operations

Passenger Services

Service Type Daily Services Annual Passengers Punctuality
North-South 20 2.5M 80%
Regional 50 4M 85%
Urban Rail 200+ Growing 95%

Freight Traffic

Commodity Annual Volume (M tonnes) Share Trend
Coal 3.5 30% Stable
Construction 2.8 24% Growing
Agricultural 2.5 21% Growing
Industrial 2.9 25% Growing

Infrastructure Development

Current Projects (2025-2027)

Project Budget (USD B) Status Completion
HCMC Metro Line 1 2.2 Final phase 2026
Hanoi Metro System 3.7 Various 2027
Track Modernization 1.8 Ongoing 2026

Future Plans (2027-2030)

Project Estimated Cost (USD B) Status Notes
North-South HSR 58.7 Planning Phased development
Urban Rail Expansion 15.3 Various Multiple cities
Port Connections 2.5 Proposed Freight capacity

Environmental Initiatives

Sustainability Goals

Initiative Target Timeline Status
CO2 Reduction -30% 2030 Planning
Energy Efficiency +25% 2028 Active
Electrification +200km 2030 Proposed

Economic Impact

Employment

Sector Direct Jobs Indirect Jobs
Operations 20,000 60,000
Construction 15,000 45,000
Maintenance 8,000 24,000

International Integration

Cross-Border Services

Country Status Service Type Frequency
China (Lao Cai) Active Mixed Daily
China (Dong Dang) Active Freight Regular
Cambodia Planned Future –
Laos Planned Future –
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO