Washington Metropolitan Area Transit Authority, Planned Metrorail Track Work, December 2025

Planned Metrorail Track Work

Metro has transitioned to a new program of preventive maintenance and planned capital work. Overnight and weekend hours will be used for enhanced preventive maintenance including cable testing to prevent smoke and fire incidents, stray current testing, trackbed cleaning, switch maintenance, torqueing (tightening fasteners, joint nuts and bolts) to eliminate excessive strain on infrastructure, and track geometry work to ensure the correct rail alignment.

NOTE: Every effort will be made to adhere to the schedule below. However, changes may be necessary due to weather, construction delays and other factors outside our control. This page will be updated as necessary.

For details about this weekend’s track work, including minor projects that may impact your trip, view wmata.com/weekend.

StartEndLineImpactStations ClosedWork Performed
Dec 6Dec 7Orange lineSilver lineOrange Line trains single track between East Falls Church and West Falls Church/McLeanNoneRail renewal of cross tie replacement
Dec 6Dec 7Green lineFree shuttle buses replace trains between Hyattsville Crossing and GreenbeltCollege Park, GreenbeltTrain control room renewal
Dec 13Dec 14Red lineTrains single track between Dupont Circle and Van NessNoneSafety walk, concrete repair, leak repair
Dec 16Dec 30Green lineAfter 10 p.m., trains single track between U St and Georgia-Av PetworthNoneRemove restraining rail, repair and replace running rail, and grout pad renewal
Jan 3 , 2026Jan 4 , 2026Red lineTrains single track between Silver Spring and Forest GlenNoneTunnel leak mitigation
Jan 3 , 2026Jan 4 , 2026Blue lineOrange lineSilver lineTrains single track between McPherson Sq and Foggy BottomNoneGrout pad rehabilitation
Jan 10 , 2026Jan 11 , 2026Green lineFree shuttle buses replace trains between Fort Totten and GreenbeltWest Hyattsville, Hyattsville Crossing, College Park-U of MDCable and cross tie renewal
Jan 12 , 2026Jan 15 , 2026Red lineAfter 10 p.m., trains single track between Silver Spring and Forest GlenNoneTunnel leak mitigation
Jan 17 , 2026Jan 18 , 2026Red lineTrains bypass Silver Spring stationSilver SpringPurple Line Project
Jan 17 , 2026Jan 18 , 2026Orange lineSilver lineTrains single track between Ballston-MU and East Falls ChurchNonePlatform edge lighting
Jan 17 , 2026Jan 19 , 2026Green lineTrains single track between Navy Yard and L’Enfant plazaNoneGrout pad rehabilitation
Jan 19 , 2026Jan 19 , 2026Red lineTrains single track between Silver Spring and Forest GlenNoneTunnel leak mitigation
Jan 24 , 2026Jan 25 , 2026Red lineTrains single track between Judiciary Sq and Union StationNoneStud and fastener maintenance
Jan 24 , 2026Jan 25 , 2026Orange lineSilver lineTrains single track between Ballston and ClarendonNonePlatform edge lighting
Jul 6 , 2026Sep 6 , 2026Red lineFree shuttle buses replace trains between Friendship Heights and North BethesdaGrosvenor-Strathmore, Medical Center, BethesdaPurple Line Project, platform rehabilitation, aerial structure replacement
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO