Home / Maintenance Scheduling / Maintenance scheduling for railway tracks under limited possession time

Maintenance scheduling for railway tracks under limited possession time


Item Type

Technical paper


Authors

Dao, Cuong D.; Basten, R.; Hartmann, A.


Citation

Dao CD, Basten R and Hartmann A (2018) Maintenance scheduling for railway tracks under limited possession time. Journal of Transportation Engineering Part A: Systems. 144(8): 04018039.

Source: https://bradscholars.brad.ac.uk/bitstream/handle/10454/17972/dao_et_al_2020.pdf


Leave a Reply

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO

Discover more from Possession Planning

Subscribe now to keep reading and get access to the full archive.

Continue reading