2.1. ACCESSING THE RAIL CORRIDOR

Before entering the Rail Corridor, the Protection Officer (PO) or Individual Access
holder (IA) must log into the PTA’s Electronic Book On System. When the work is
completed, the PO or Individual Access holder (IA) must log off in the Electronic Book
On System.
If for any reason the Electronic Book On System fails to record the details then the
Infrastructure Control Officer (ICO) must be contacted.

 


Rule 3000 – PLANNING WORK IN THE RAIL CORRIDOR

1. Purpose
2. General
2.1. Accessing the Rail Corridor
3. Protection Officer
4. Assessing Safety
4.1. Use of Plant Near or Work Above the Danger Zone
5. Multiple Access Providers
6. Level Crossings
7. Methods for Working Safely on Track
7.1. Running Lines in the Network Outside Depots
7.2. In Depots
8. Local Possession Authority
9. Track Occupancy Authority
10. Absolute Signal Blocking
11. Lookout Working
12. Walking in the Danger Zone
13. Reference
14. Effective Date

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO