5. MULTIPLE ACCESS PROVIDERS

If the Planned Work will affect Track under the control of more than one Access
Provider, the PO must get the relevant Train Controllers Authority.

NOTE
POs must be aware of the Protection arrangements required for Adjoining Networks. Where necessary, Competent Workers must be qualified in the Adjoining Networks rules and procedures.

 


Rule 3000 – PLANNING WORK IN THE RAIL CORRIDOR

1. Purpose
2. General
2.1. Accessing the Rail Corridor
3. Protection Officer
4. Assessing Safety
4.1. Use of Plant Near or Work Above the Danger Zone
5. Multiple Access Providers
6. Level Crossings
7. Methods for Working Safely on Track
7.1. Running Lines in the Network Outside Depots
7.2. In Depots
8. Local Possession Authority
9. Track Occupancy Authority
10. Absolute Signal Blocking
11. Lookout Working
12. Walking in the Danger Zone
13. Reference
14. Effective Date

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock