4.15. ELECTRICAL INFRASTRUCTURE AND OLE

For any work activity, including excavations, the person in charge of the work must
ensure controls are in place to ensure both the stability of the Permanent Way and that
bonding, masts and other lineside structures are neither affected nor damaged.