Morocco Rail Network Profile

Morocco operates one of Africa’s most modern rail networks, including Africa’s first high-speed line (Al Boraq), conventional services (ONCF), and urban transit systems in major cities.

Network Overview

Parameter Statistics Notes
Total Track Length 2,295 km All lines
High-Speed Lines 200 km Al Boraq
Conventional Lines 2,095 km ONCF network
Track Gauge 1,435 mm Standard gauge
Electrified Lines 1,284 km 3kV DC/25kV AC
Urban Systems 2 cities Casablanca, Rabat

Major Systems

High-Speed Network (Al Boraq)

Route Length (km) Speed (km/h) Status Usage
Tangier-Kenitra 200 320 Operational Passenger
Kenitra-Casablanca* 150 320 Planned Extension
Casablanca-Marrakech* 230 320 Proposed Future

*Planned/Proposed

Urban Rail Systems

City System Length (km) Stations Daily Riders
Casablanca Tramway 47 71 250,000
Rabat-Salé Tramway 27 43 180,000

Technical Parameters

Track Infrastructure

Parameter High-Speed Conventional Urban
Track Gauge 1,435 mm 1,435 mm 1,435 mm
Power Supply 25kV AC 3kV DC 750V DC
Max Speed 320 km/h 160 km/h 70 km/h
Axle Load 17 tonnes 22.5 tonnes 12 tonnes

Rolling Stock

High-Speed Fleet

Type Quantity Manufacturer Capacity Speed
Alstom Avelia 12 Alstom 533 320 km/h

Conventional Fleet

Type Quantity Capacity Status Usage
Electric Locomotives 50 N/A Active Mixed
Diesel Locomotives 30 N/A Active Mixed
Passenger Cars 450 Various Active Intercity
EMUs 24 1,000 Active Regional

Urban Fleet

City Type Units Capacity Manufacturer
Casablanca Citadis 74 250 Alstom
Rabat Citadis 44 250 Alstom

Operations

High-Speed Services

Route Daily Services Journey Time Annual Passengers
Tangier-Casablanca 28 2h 10m 3.5M

Conventional Services

Route Daily Services Journey Time Annual Passengers
Casablanca-Marrakech 24 3h 4.2M
Fez-Oujda 12 5h 1.8M
Rabat-Fez 20 2h 30m 2.5M

Infrastructure Development

Current Projects (2025-2027)

Project Budget (USD B) Status Completion
HSR Extension 2.5 Planning 2027
Network Modernization 1.2 Ongoing 2026
Urban Rail Expansion 0.8 Active 2026

Future Plans (2027-2030)

Project Estimated Cost (USD B) Status Notes
HSR South Extension 3.0 Proposed To Marrakech
New Urban Systems 2.0 Planning Multiple cities
Port Connections 0.5 Concept Freight focus

Environmental Initiatives

Sustainability Goals

Initiative Target Timeline Status
CO2 Reduction -40% 2030 In progress
Renewable Energy 50% 2028 Active
Energy Efficiency +30% 2027 Ongoing

Smart Solutions

Technology Implementation Coverage Status
Digital Ticketing Network-wide 100% Active
Real-time Info All services 95% Operating
Predictive Maintenance HSR 100% Active

Economic Impact

Employment

Sector Direct Jobs Indirect Jobs
Operations 8,000 24,000
Maintenance 3,500 10,500
Construction 5,000 15,000
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock