Home / Possession Planning / Rail Planning / Moondyne Turnout Replacement Showcased at Rail Turnouts 2025

Moondyne Turnout Replacement Showcased at Rail Turnouts 2025

Presentation Highlights from Sean McAllister

The extensive Moondyne west end turnout replacement project was recently featured in a presentation by Sean McAllister, Project Lead – Track, at the #RailTurnouts 2025 conference.

Sean provided a comprehensive overview of:

  • The scope and complexity of the works

  • Planning and staging for the particularly challenging section of the Eastern Goldfields Railway

  • Execution of works during a tightly managed 86-hour shutdown in October

Project Overview

The project involved:

  • Replacement of three dual-gauge turnouts at the west end of the Moondyne crossing loop

  • Extensive coordination and months of preparation

  • Successful delivery by Arc teams under high-pressure constraints

The result was a safe and efficient outcome on a crucial piece of Western Australia’s freight rail network.

📖 Read more about the project and what’s next


More Info

Tagged:

Leave a Reply

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO

Discover more from Possession Planning

Subscribe now to keep reading and get access to the full archive.

Continue reading