United Arab Emirates Rail Network Profile

UAE operates a developing rail network through Etihad Rail, featuring freight and passenger services, alongside advanced metro systems in Dubai and Abu Dhabi (under construction), with significant expansion plans.

Network Overview

Parameter Statistics Notes
National Network 1,200 km Etihad Rail
Urban Metro 90 km Dubai Metro
Track Gauge 1,435 mm Standard gauge
Electrified Lines 90 km Urban systems
International Links Planned GCC Railway

Major Systems

Etihad Rail Network

Section Length (km) Status Usage Type
Stage 1 264 Operational Freight Sulfur transport
Stage 2 605 Active Mixed National network
Stage 3 331 Planning Mixed Urban connection

Dubai Metro

Line Length (km) Stations Daily Riders Status
Red Line 52.1 29 500K Operational
Green Line 22.5 20 200K Operational
Route 2020 15 7 125K Operational

Technical Parameters

Track Infrastructure

Parameter National Rail Urban Metro GCC Standard
Track Gauge 1,435mm 1,435mm 1,435mm
Power Supply Diesel 750V DC 25kV AC
Max Speed 200 km/h 90 km/h 200 km/h
Signaling ETCS L2 CBTC ETCS L2

Rolling Stock

National Fleet

Type Quantity Manufacturer Usage Status
Locomotives 45 EMD Freight Active
Passenger Sets 15* CAF Planned Ordered
Freight Wagons 1,200 Various Active Operating

*Planned/Ordered

Urban Fleet

Type Quantity Manufacturer Capacity System
Metro Sets 129 Kinki Sharyo 643 Dubai Metro
Tram Sets 11 Alstom 408 Dubai Tram

Operations

Passenger Services

Service Type Daily Services Annual Passengers Punctuality
Dubai Metro 1,200+ 200M 99.9%
Dubai Tram 364 6M 99%
National Rail* Planned – –

*Future service

Freight Traffic

Commodity Annual Volume (M tonnes) Share Trend
Sulfur 7 60% Stable
Construction 2.5 21% Growing
Industrial 2.2 19% Growing

Infrastructure Development

Current Projects (2025-2027)

Project Budget (AED B) Status Completion
Stage 2 Completion 18 Active 2026
Passenger Services 12 Planning 2026
GCC Connection 8 Planning 2027

Future Plans (2027-2030)

Project Estimated Cost (AED B) Status Notes
Stage 3 Development 25 Planning Urban integration
Metro Extension 15 Proposed Dubai expansion
Abu Dhabi Metro 40 Planning New system

Environmental Initiatives

Sustainability Goals

Initiative Target Timeline Status
CO2 Reduction -40% 2030 Active
Solar Power 50% usage 2028 Planning
Energy Efficiency +35% 2027 Ongoing

Smart Solutions

Technology Implementation Coverage Status
Smart Gates Metro stations 100% Active
Real-time Info All systems 100% Operating
Predictive Maintenance Network-wide 90% Advanced

Desert Operations

Climate Adaptation

Challenge Solution Implementation
Sand Management Protection systems Network-wide
Heat Impact Advanced cooling All systems
Solar Exposure Special materials Infrastructure
Dust Control Regular maintenance Continuous

Economic Impact

Employment

Sector Direct Jobs Indirect Jobs
Operations 5,000 15,000
Construction 8,000 24,000
Maintenance 3,000 9,000
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock