Secondary Track Standards and Specifications

Secondary tracks are lower-speed routes serving branch lines, local traffic, and industrial connections.

Basic Parameters

Parameter Standard Minimum Maximum
Track Gauge 1435mm 1432mm 1440mm
Rail Profile 54E1/49E1 46E1 54E1
Sleeper Spacing 650mm 600mm 700mm
Ballast Depth 250mm 200mm 300mm
Track Centers 3.8m 3.5m 4.0m

Speed Classifications

Class Passenger Freight Usage
Class 3 80-120 km/h 60-80 km/h Regular
Class 4 60-80 km/h 40-60 km/h Limited
Class 5 40-60 km/h 30-40 km/h Local
Class 6 <40 km/h <30 km/h Industrial
Yard <25 km/h <25 km/h Shunting

Geometric Standards

Parameter Standard Minimum Maximum
Curve Radius 400m 200m 800m
Gradient 2.0% 0% 3.5%
Cant 120mm 0mm 150mm
Transition Length 200m 100m 300m
Vertical Curve 2000m 1000m 5000m

Maintenance Tolerances

Parameter New Warning Limit
Gauge +2/-1mm +4/-2mm +6/-3mm
Alignment ±3mm ±8mm ±12mm
Cross Level ±3mm ±8mm ±12mm
Twist (3m) 1:500 1:400 1:300
Rail Wear 0mm 12mm 15mm

Infrastructure Requirements

Component Specification Tolerance
Formation E₂ ≥ 45MPa ±5MPa
Sub-ballast 100mm +30/-0mm
Ballast 250mm +50/-0mm
Drainage 1:30 slope ±1:50
Shoulder Width 400mm +100/-0mm

Inspection Frequency

Element Visual Measured Detailed
Track Weekly Monthly Annual
Switches Daily Weekly Quarterly
Structures Monthly Quarterly Annual
Drainage Monthly Seasonal Annual
Vegetation Monthly Seasonal Annual

Loading Standards

Type Axle Load Speed
Freight 22.5t 60 km/h
Passenger 18.0t 80 km/h
Light Rail 16.0t 100 km/h
Special 25.0t 40 km/h
Maintenance 20.0t 50 km/h

Switch Types

Type Length Speed
1:8 16.5m 40 km/h
1:9 18.5m 50 km/h
1:10 22.0m 60 km/h
1:12 27.5m 80 km/h
Trap 12.0m 25 km/h

Signaling Systems

Type Block Length Control
Color Light 800m Local
Mechanical 600m Manual
Token Block Variable Staff
Radio Variable Central
Basic Visual Rules

Track Components

Component Standard Life Expectancy
Rails 54E1/49E1 20-25 years
Sleepers Concrete/Wood 30/15 years
Ballast 31.5-50mm 15-20 years
Fasteners Elastic 10-15 years
Joints 6m/18m 5-8 years

Maintenance Schedule

Activity Frequency Tolerance
Inspection Weekly +3 days
Tamping Annual ±2 months
Grinding 3 years ±6 months
Ballast Clean 10 years ±1 year
Renewal 25-30 years ±5 years

Environmental Controls

Factor Standard Action
Noise 75dB(A) Monitoring
Vibration 75VdB Check
Drainage 100mm/h Clear
Vegetation 3m clearance Cut
Pollution Basic Control

Operational Parameters

Aspect Requirement Notes
Headway 15-30 min Peak
Capacity 6-8 tph Mixed
Dwell Time 1-2 min Stations
Recovery 8% Timetable
Reliability 90% Target
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock