Home / Scope of Works / Spain, Catalonia – Osormort Viaduct: Pioneering Cable-Stay System Rehabilitation

Spain, Catalonia – Osormort Viaduct: Pioneering Cable-Stay System Rehabilitation

The 1995 Osormort Viaduct, world’s first under-deck cable-stayed bridge with extradosed tendons, underwent critical rehabilitation following severe corrosion detection in 2023.

Technical Specifications

Component Original (1995) Replacement (2024)
System Type Under-deck cable-stayed VSL XT-M PLUS 6-22
Tendon Count 26 extradosed 26 new units
Design Feature Continuous prestressed concrete Enhanced maintenance access
Tensioning Method Traditional Strand-by-strand
Corrosion Protection Standard Advanced system

Implementation Process

Phase Scope Technical Detail
Temporary Support Installation of temporary tendons Load transfer system
Removal De-stressing damaged elements Controlled demolition
Installation New extradosed system VSL XT-M PLUS 6-22
Bearing Replacement Both abutments Modern pot bearings
Monitoring Real-time structural analysis Continuous assessment

Technical Achievement

Key elements include:
. Advanced tendon system
. Enhanced maintainability
. Improved corrosion protection
. Structural monitoring
. Safety implementation
. Heritage preservation

Engineering Innovation

The rehabilitation delivers:
. Strand-by-strand tensioning
. Easier inspection access
. Superior protection
. Extended service life
. Enhanced safety
. Modern monitoring capability


More Info

Tagged:

Leave a Reply

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock

Discover more from Possession Planning

Subscribe now to keep reading and get access to the full archive.

Continue reading