Within the station cavern (Lot 2), the team continue to progress with mechanical, electrical and ventilation service installation around the cavern, on the mezzanine level (B4), in the tunnel a...
Construction of the Albert Street main station entrance (Lot 1) remains ongoing below and above the ground surface. Over the last fortnight, the jump form system which is constructing the station wall...
Cross River Rail is a 10.2km rail line from Dutton Park to Bowen Hills, which includes 5.9 kilometres of twin tunnels under the Brisbane River and Brisbane CBD. The project includes construction of fo...


