Project Overview

The Southern Renewals Enterprise VolkerRail Ltd Tonbridge Track Renewals team has successfully completed a challenging electrification project at Portcreek Junction S&C 2640 Pts & 2641 Pts.

Completed Electrification Works

Installation Achievements

  • 620m of Conductor Rail installed (including 420m new)
  • 1,100m of new Positive & Negative cable installed using 26 Cable Management Sleepers
  • 6 new Advance Plates
  • 4 new Track Disconnectors
  • New Points Heating system including:
    • 1 control cubicle
    • 2 PHTs
    • 2 TCBs installed by the Points Heating team

Additional Works

  • Successful Section Proving with Eastleigh ECR before handback
  • Switch-out of HV Feeders 2275 & 2218 for safe track excavation
  • Temporary generator installation at Fratton & Portsmouth Substations

Special Acknowledgment

Special thanks to A&M ELECTRICALS LTD for their support and management of the generator works.

 

More Info

Tagged:

Leave a Reply

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock

Discover more from Possession Planning

Subscribe now to keep reading and get access to the full archive.

Continue reading