The purpose of this rule is to provide instructions to ensure that appropriate planning is
carried out for work within the Rail Corridor in the Public Transport Authority (PTA)
Network.
Rule 3000 – PLANNING WORK IN THE RAIL CORRIDOR
1. Purpose
2. General
2.1. Accessing the Rail Corridor
3. Protection Officer
4. Assessing Safety
4.1. Use of Plant Near or Work Above the Danger Zone
5. Multiple Access Providers
6. Level Crossings
7. Methods for Working Safely on Track
7.1. Running Lines in the Network Outside Depots
7.2. In Depots
8. Local Possession Authority
9. Track Occupancy Authority
10. Absolute Signal Blocking
11. Lookout Working
12. Walking in the Danger Zone
13. Reference
14. Effective Date