A specialized delivery operation for two 35-metre NR60 G switches was successfully executed at Stoke Junction, utilizing rail transport and tandem RRV (Road Rail Vehicle) offloading due to access constraints.
Technical Specifications
| Parameter | Detail |
|---|---|
| Component Type | NR60 G Switches |
| Length | 35 metres |
| Quantity | 2 complete sets |
| Transport Method | Super Falcon wagons |
| Offloading Equipment | Tandem RRVs |
| Site Access | Rail-based delivery |
Operational Requirements
| Element | Implementation |
|---|---|
| OLE System | Full isolation |
| Access Planning | Rail route utilized |
| Equipment | Specialized wagons |
| Safety Measures | Complete isolation |
| Machine Operations | Tandem coordination |
| Permits | Full documentation |
Technical Achievement
Key aspects include:
. Alternative delivery solution
. Specialized transport equipment
. Coordinated lifting operations
. Safety protocol implementation
. Access constraint management
. Team coordination
Operational Benefits
The operation delivered:
. Safe component handling
. Access solution
. Efficient delivery
. Minimal disruption
. Risk mitigation
. Schedule adherence