ARTC, Safe Notice 2-5566 ARTC & Sydney Trains LPA limit protection arrangements WE02 Config 10B...
ARTC-Interstate-Possesssions-Calendar-May-2024-Update Possession Planning – Current Possession Calendars Latest Possession Calendars Australia ARTC https://possessionplanning.com/p...
ARTC, Interstate Disruptive Possessions Plan (FY24/25), Version 2...
ARTC, Interstate Disruptive Possessions Plan (FY23/24), Revision 7, 23/04/2024 ...
Busy weekend for the Sydney Trains Bridge team at Awaba. Successfully completed 2 Bridge Renewals, 1.1km of Track Lift, Rail Adjustments and OHW Adjustments. This totals 3 Bridges replaced at Awaba ov...
Latest Possession Calendars Sydney Trains Mid Week Possession Calendar 2023-2024, Version 6.0 Our Partners FR2 Infrastructure – Constructability advise and project and planning controls ...
Latest Possession Calendars Sydney Trains Possession Calendar 2023-2024, Version 6.0...
Cross River Rail is a 10.2km rail line from Dutton Park to Bowen Hills, which includes 5.9 kilometres of twin tunnels under the Brisbane River and Brisbane CBD. The project includes construction of fo...
Philadelphia's Penn Coach Yard undergoes major transformation with new Heavy Maintenance Facility, advancing Northeast Corridor rail operations...
Notification – Lakemba, March 2024 Sydney Metro is Australia’s biggest public transport project. – By 2030, Sydney will have a network of four metro lines, 46 stations and 113km of new me...
Works Progressing at Arc Infrastructures Intermodal site in Kenwick adjacent to the Arc infrastructure Flashbutt depot and Plant Depot Source ...
ARC Southwest track maintenance team undertook and completed the renewal of Coalfields Highway level crossing, the primary heavy haul artery to Collie. With a mammoth scope comprising a 40-meter cross...
UGL Regional Linx, Possessions List, Major, 25 September 2023...
Transwa System Map, 2020...
STRAIL® Level Crossing Systems – Germany Company History STRAIL® pioneered its first level crossing system in 1976, establishing a foundation built on close client collaboration. The brand name ...
Twin 50m long steel girder bridges were installed over Narre Warren-Cranbourne Road using a highly specialized self-propelled modular transporter The steel girders were assembled off-line on-site, and...
The A30 Chiverton Footbridge was successfully installed last week by Nusteel Structures Limited. The 48m span, weighing 92te was designed, manufactured, painted and installed in-house – Reducing...
Latest ARTC Possession calendar ARTC Interstate Disruptive Possession Plan (2023-2024), 23/08/2023, Version 3 ARTC-Interstate-Disruptive-Possessions-Plan-FY23-24-Version-3...
ARTC-Interstate-Possession-Calendar-November-2023-Update Our Partners FR2 Infrastructure – Constructability advise and project and planning controls Staging Diagrams – Stagi...
Latest ARTC Possession Calendars ARTC, HUNTER VALLEY, 2023, ANNUAL POSSESSION PROGRAMME, Version 5...
The Lilydale Line will be the first rail line to become boom gate free, next year. Removing the last 3 sets of boom gates on the Lilydale Line at Dublin Road in Ringwood East, Coolstore Road in Croydo...
Achieving the impossible. Many were in doubt that we would have been able to complete the works, yet alone in only 12 weeks. The trials, demolition and reconstruction of the Barmouth Metallic Viaduct ...
The station canopy at Exhibition station was lifted into place recently. Check out these before and after pics of the exciting milestone Source ...
56 hours later… Checkout this timelapse of the team lifting and installing two pedestrian walkways for the future Noranda Station. Using a 750 tonne crane, teams worked around the clock to lift these ...
The first roof arch of Riga Central Station adds to Riga’s skyline! Rail Baltica Riga Central Station construction site was launched at the end of November 2020. The third year of constru...
The next stage of Beaver Bridges Ltd work to install a bridge over the A5 at Mile End in Oswestry will be carried out next Monday when the bridge is lifted into position on the evening of Monday 27th ...
A New Road over rail bridge is now in use at Burrucoppin on the East / West Line of the Arc network Source ...
Network closures calendar Month – Years Line Start Location End Location Service Disruption Last passenger service Track Clear Track Hand Back First passenger service 2023 Dec-23 L2L3 Circular ...
SRG Global have recently completed the installation, stressing and grouting of multistrand #posttensioning to METRONET‘s Whiteman Park Viaduct for client Laing O’Rourke. The two 10-span ...
Innovative Wellington-made technology to protect the rail line while building the Ngā Ūranga ki Pito-One (Ngauranga to Petone) section of Te Ara Tupua, the project to improve State Highway 2’s r...
Catalogue, Oleo, Buffer Stops ...
Catalogue, BUFFER STOPS, Thermit...
Catalogue – Liberty OneSteel...
The A16 Rotterdam highway’s 400-meter-long flyover is steadily advancing, with the second and final deck installation in full swing. Segment by segment, this impressive structure is pushed acros...
Spare a thought for the team at Rail Systems Alliance Scotland who have been busy up at Cradlehall near Inverness bracing the cold weather carrying out rerailing work on our infrastructure with report...
Check out the final pair of steel beams being lifted into place on a bridge being built for Te Ahu a Turanga: Manawatū Tararua Highway. All 42 beams are now in place on the Eco-Viaduct bridge, one of ...
Albany Ring Road, new Road over Rail bridge new spans being installed today over the Arc narrow gauge network in the South of Western Australia. Source ...
Latest Possession Calendars Sydney Trains Possession Calendar 2023-2024, Version 4.1 Our Partners FR2 Infrastructure – Constructability advise and project and planning controls Staging D...
Nice assortment of timber underneath old pipes. This one near Gibson on the Esperance line of the Arc network , a terrific job again by contractors and Goldfields Team 3 for Trackworks assistance. Del...
Arrival on-site and prep works for replacement tomorrow at Burrucoppin on East / West line of the Arc network with the assistance from Martinus Rail with Trackworks Source...
State Highway 25A update: Workers continue to make great progress on the new bridge we’re building over the slip on SH25A in Coromandel, where the road collapsed during the storms earlier this y...
Loading of the TBM in Columbus. The big move is tomorrow. #Baycrane #capitalcitygroup #gatwoodcrane Source...
Burrucoppin on the East / West Line so far , replacement in 7.5 hrs , Martinus Rail team now preparing for welds and destress. Terrific effort by all. Source...
Arc infrastructures Major Projects team doing a top up Ballast drop at 1 of there concrete resleepered sites north of Norseman on the Esperance Line of the Arc network Source...
Fantastic work by Abergeldie Complex Infrastructure rail team recently, completing a track reconditioning project at Antiene for ARTC during the November Hunter Valley major closedown. The works were ...
It’s lift-off for the T3 Bankstown Line, with the brand-new lifts at Dulwich Hill Station now open to passengers! This means that all stations from Sydenham to Bankstown have now been made fully acces...
Week 35 – Plain Line Heavy Renewal of Platform 3 at Eastbourne An incredible effort this weekend from all involved. Despite all the challenges, including an engineering train derailment that res...
Queensland Rail will be undertaking track maintenance works along the track between Blackall Terrace and Brookes Street, Nambour. Date and time: Works will be occurring between 11pm Friday 24 and 6am ...
Queensland Rail will be undertaking track maintenance works in the following location: Between Wilga Street, Wacol to Gailes station. Date and time: Works will be occurring between 9pm Sunday December...
The Rail Systems Alliance Scotland Team was busy over the weekend with 12 mobilisations delivering on Core works, preparations and follow up activities. Spotlight below from the East Coast at Dalmeny,...
Recently TENEX were engaged by ARTC to provide 2x undercutting teams for a weekend shut. Here’s a snap of one of the teams in action. (Source)...
Last weekend Goldspring supplied two undercutting and retimbering teams to ARTC in the southern area. With the strong focus on people and plant interaction during pre work briefs the weekend was incid...
Network closures calendar ID Line Service Disruption Start Location End Location Planned / Single Project Last PAX Service Track Clear Track Hand Back First PAX Service 2203 L1 Weekend Lewisham...
Latest Possession Calendars Track possession applications are subject to minimum application periods and various other factors before approval is given to conduct the works. The Interstate Possessions...
Interstate Possession Documents Title Last Updated Version Iterstate Possessions Calendar ARTC-Interstate-Possession-Calendar-October-2023-Release-External-Only 25/10/2023 October 2023 Release Int...
Latest Possession Calendars Calendars Title Version Last Updated Owner 2024 Hunter Valley Combined Network Possession Plan 2024 3 20 Oct Integrated Planning Hunter Valley Possession List...
Latest Possession Calendars Description: Major Closedown and Weekend Possession Programme Effective Date: 6th March 2023 Version: Version 7.0...
Exhibition station construction update Exhibition station will be operational during EKKA 2022 for people wishing to catch the train into the Brisbane Showgrounds. Timetables are available on the Tran...
Latest Possession Calendars 220725-221106 future-trackwork-calendar ...
Network closures calendar ID Line Service Disruption Start Location End Location Planned / Single Project Last PAX Service Track Clear Track Hand Back First PAX Service 2203 L1 Weekend Lewisham...
What happened On 29 July 2020 at 0508, a loaded Pacific National (PN) coal train MB526 collided with the rear of a One Rail Australia (ORA) coal train AH378. MB526 was routed behind AH378 on number 3 ...
ReadyPower Rail Services ‘Recived a call Wednesday night from a key client asking for 2 Mewps and all associates staff to attend a derailment site in the North East! The Readypower team managed ...
Getting freight back on track over the Blue Mountains, Published, 21 Mar 2022 The NSW Government is working to repair and reopen the Blue Mountains rail line, a critical freight corridor linking east ...
TOC Manual (NSW/QLD) Large sections of the ARTC TOC Manual have been replaced by the ARTC Route Access Standard (RAS) or apply to track sections which are no longer managed by ARTC. The version of the...
Effective Date:Tue 13 Oct 2020 Version:1.0 Source: Link...
Effective Date:Tue 13 Oct 2020 Version:1.0 Source: Link...
Effective Date: Fri 28 Feb 2020 Source: Link...
Effective Date:Tue 13 Oct 2020 Version:1.0 Source: Link...
Chullora Junction, Boundary Map 2021 Version 1.03 “] ARTC, 2021 Effective Date:Tue 13 Oct 2020 Version:1.0 Source: Link...
Description: Major Closedown and Weekend Possession Programme Effective Date: Mon 14 Feb 2022 Version: Version 5.0 Source: Link...
Check out these photos of resurfacing machines in action on the #CRN Due to their size, they had to be recently unloaded via a crane onto the rails at the Orange Depot. Thanks Ventia for loaning these...
Amtrack network Version 10 2018 https://possessionplanning.com/wp-content/uploads/2022/02/Amtrak-System-Map-1018._rev10_2018.pdf...
Indian Railways, Year Book Source: https://indianrailways.gov.in/railwayboard/view_section.jsp?lang=0&id=0,1,304,366,554 Indian Railways (IR) is a government-owned organisation owned by the g...
‘Melbourne once had one of the world’s best public transport systems. The forethought and planning ofVictorians more than a century ago, and their capacity to value the welfare of Victorians of ...
Train Operating Conditions (TOC) Manual – Division Pages Version Effective Superseded Preview Version 23 15 December 2021 Current https://possessionplanning.com/wp-content/uploads/2022/02/211215...
Lithgow, Netwok Local Appendices (NLA 218), source: https://railsafe.org.au/__data/assets/pdf_file/0005/46409/218-Lithgow-v7.0.pdf DRIVERS ROUTE KNOWLEDGE DIAGRAMS MAIN WEST (BLUE MOUNTAINS) LINE (Ver...
Design Guidelines for the Upgrade & Construction of New & Existing Train Stabling Yards and Turnback Sidings Source: https://www.transport.nsw.gov.au/system/files/media/documents/2017/ref-15.p...
Source: https://www.transport.nsw.gov.au/system/files/media/asa_standards/2017/cv0169477.pdf...
On the evening of 3 June 2020, two Aurizon banking locomotives assisted a loaded coal train,WH512, up the Ardglen bank in the Hunter Region of New South Wales (NSW). On completion ofthe banking assist...
Source: https://www.artc.com.au/uploads/OPE-PR-045-Interstate-Possession-Planning-and-Approval-V2.0.pdf...
Item Type Technical paper Authors Dao, Cuong D.; Basten, R.; Hartmann, A. Citation Dao CD, Basten R and Hartmann A (2018) Maintenance scheduling for railway tracks under limited possession time. Journ...
Source: https://www.artc.com.au/work/hunter-valley-possessions-management/...
Source: https://www.artc.com.au/work/hunter-valley-possessions-management/...
Source : https://www.artc.com.au/work/hunter-valley-possessions-management/ Version 1...
Source: https://transportnsw.info/future-trackwork-calendar...